Project Description
Transported purification plant equipment which include 2 boiler of 100 tons each and 2 gas Turbines of 65 tons each to Sui Gas Fields (Distance 700 Kms) via 50km stretch of rough and rolling terrain. We have shifted their 10″ to 24″ Dia 40 ft long steel line pipes from Karachi / Kotri to various up-country locations.