BHIKKI POWER PLANT
Transportation of cargo included packages weighing more than 370 metric tonnes.
PARCO OIL REFINERY
448 metric tonnes of Diesel Max Reactor and other super cargo as long as 53.08 meters had to be transported over a distance of more than 900 km. The reason: Parco Oil Refinery was being set-up at Mehmood Kot.
FFCEL WIND POWER PROJECT
102 blade units, 33 sets of towers and 33 units of Nacelle were transported for FFCEL for their Wind Power Project in no time.
GUDDU POWER PROJECT, 747MW
The transportation of equipment for the Guddu Power Project included a couple of Gas Turbines weighing 280 metric tonnes each. A side combination of hydraulic platform trailers were used in the transportation to save time and money.
HUBCO – NAROWAL PROJECT, 213 MW
Transportation of 11 MAN, Diesel Engines (dimensions 13.1 x 4.95 x 6.36 meters, weight: 320 tons each) and 11 Boilers (dimensions: 13 x 5 x 4.1 meters, weight: 87 tons each) for Hubco Narowal Project from Karachi Port / Port Qasim to Narowal. Distance: 1420 km.