NISHAT POWER PROJECT, 2 x 195 MW
Transportation of Wartsila engines (dimensions: 13.66 x 4.09 x 6.00 meters, weight: 295 ton each) and 11 Boilers (dimensions: 13 x 5 x 4.1 meters, weight: 87 ton each) from Port Qasim to Chunnian site, near Lahore. Distance: 1320 km.
ATLAS POWER PROJECT, 213 MW SHEIKHUPURA
Transportation of MAN, Diesel engine (dimensions: 13.1 x 4.95 x 6.36 meters, weight: 320 ton) and 11 boilers dimensions: 13 x 5 x 4.1 meters, weight: 87 ton each from Port Qasim to Atlas Power Project site, Sheikhupura. distance: 1200 km.
LIBERTY POWER PROJECT, 195 MW
Transportation of 3 Wartsila engines (dimensions: 13.66 x 4.09 x 6.00 meters, weight: 295 ton each) and 11 boilers (dimensions: 11 x 5 x 4 meters, weight: 73 ton each) from Port Qasim to Faisalabad. Distance: 1200 km.
JINNAH TERMINAL PROJECT KARACHI
Custom clearance and transportation for the entire project of Jinnah Terminal Karachi.
HUB POWER PLANT, BALOCHISTAN
Equipment for the Hub Power Plant included a 270 ton transformer which had to be transported on 16 axle lines through difficult terrain of Balochistan.
FORASOL DRILLING CONTRACTORS KARACHI
Transportation of drilling rigs from Karachi to Meyal fields and between different sites in 1985.