Project Description
Two Tunnel boring Machines were smoothly transported through the challenging mountainous region. Focal point of the project was the construction and placing of 41 meter long (3 spans 11+19+11 m) specially engineered steel structure bridge. the bridge was placed over river Jhelum at C-2 site near Gari Dupatta, Muzzafarabad at the distance of 1775 km from Karachi.