Project Description

Descon Engineering (Pvt) Ltd, awarded us the job for transportation of  plant equipment from Port Qasim project site located some 28 Km from the Port  in Bin Qasim Industrial area.

A used Ammonia plant, comprising of over 38000 freight ton had  been transported in first phase. The whole plant was brought in four shipments, the largest one was of 12493 F. ton. The significance of the job was direct delivery of whole plant onto trailers from vessel tackle.

Following abnormal packages  were transported:

i)   UREA  REACTION  VESSEL
Size: 36 x 3.89 x 3.89 meters
Weight: 301  ton

ii) CO2 ABSORBER
Size: 55.47 x 5.18 x 6.30 meters
Weight: 286 tons

iii) BOILER V-406
Dimensions: 10.05 x 9.75 x 6.06 meters
Weight: 185 tons